Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Solar PV in Drawings for the 2922-34 Course: Size the String, Isolate the DC and Test in the Right Order One Topic on Every Page

Written for electricians who already know the AC side: site survey, string sizing, roof mounting, DC isolation, inverters, testing, G98 and G99, and the handover pack. Every topic has its own page: the drawing first, then what you need to remember. 64 illustrated pages.

GET THE ILLUSTRATED PV BOOK

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEvery step of the job drawn, with the explanation beside it
64 illustrated pages9 parts, from the whole system on one drawing to the revision checklists
Up-to-date sourcesBS 7671 (Section 712), BS EN 62446-1 and ENA G98/G99
PDF by emailFormat

Look Inside the Book

Each page has one big drawing and a box with the numbers, steps and rules you need to know:

Modules → string → DC isolator → inverter → AC isolator → consumer unit → meter → grid
Modules → string → DC isolator → inverter → AC isolator → consumer unit → meter → grid
Size from the bills, daytime use and roof space; a battery changes the sums.
Size from the bills, daytime use and roof space; a battery changes the sums.
−0.3 %/°C and a cell at −10 °C: Voc × 1.105.
−0.3 %/°C and a cell at −10 °C: Voc × 1.105.
Work at Height Regulations 2005: avoid → prevent falls → minimise the consequences.
Work at Height Regulations 2005: avoid → prevent falls → minimise the consequences.
BS EN 50618 PV cable, double insulated, sized on Isc max = 1.25 × Isc(STC)
BS EN 50618 PV cable, double insulated, sized on Isc max = 1.25 × Isc(STC)
String, micro or optimiser: where the DC ends and what that means for testing
String, micro or optimiser: where the DC ends and what that means for testing
TN-C-S, TN-S or TT: three drawings, one decision made at the survey.
TN-C-S, TN-S or TT: three drawings, one decision made at the survey.
Continuity → polarity → Voc → Isc → functional → insulation: the DC sequence of BS EN 62446-1.
Continuity → polarity → Voc → Isc → functional → insulation: the DC sequence of BS EN 62446-1.

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 9 parts and 60 topics.

The Problem Isn't You. It's How It Was Explained.

You're at the practice rig and the assessor points at the string: on the coldest morning of the year, does it still fit the inverter?

You've done AC work for years. But the course notes give cold-weather Voc as a formula buried in a paragraph, and under pressure the datasheet Voc, the temperature coefficient and the inverter's maximum input blur into one number.

−0.3 %/°C and a cell at −10 °C: Voc × 1.105.

In the book it's one page: the module's Voc climbing as the thermometer drops, the inverter's limit drawn as a line, and a worked example right beside it.

The same goes for series and parallel strings, the DC isolator, the RCD type and the DC test order: each one has its own page.

You look, it clicks, and you give the assessor the answer without going back to the manual.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Study It

THIS
  • The manual: line after line
  • Survey checks described only in words
  • You reach the roof still unsure
The site survey shall be undertaken prior to system design and shall establish, inter alia, the type, condition and structural adequacy of the roof covering and its supporting members, the orientation and inclination of the proposed array plane, the presence of near and far shading objects, the means of safe access for installation and subsequent maintenance, the proposed DC cable route, the location of the inverter and the characteristics of the existing installation, including the earthing arrangement, the main fuse rating and the condition of the consumer unit.
FOR THIS
  • The site survey as one drawn checklist
  • The 11 checks in a numbered box
  • You see it and you get it
Size from the bills, daytime use and roof space; a battery changes the sums.
CONTENTS

Take a Look at the 9 Parts and 60 Topics

The system on one drawing, survey and design, strings and sizing, roof mounting, DC wiring and isolation, inverter and batteries, earthing and surge protection, testing and grid connection, and revision: 64 pages, all illustrated

IThe System on One Drawing · pp. 5-10
  1. The whole system in one diagram
  2. DC side vs AC side: what changes
  3. Cell, module, string, array
  4. Reading a module datasheet
  5. The I-V curve in one look
  6. Where the rules come from
IISite Survey and Design · pp. 11-17
  1. The site survey in order
  2. Orientation and pitch
  3. Shading and the sun-path diagram
  4. Estimating annual yield
  5. Sizing to the household
  6. Choosing the inverter size
  7. Planning the cable route
IIIStrings and Sizing · pp. 18-24
  1. Series and parallel: what adds up
  2. Voc goes up in the cold
  3. Maximum string length: worked example
  4. Minimum string length and the MPPT window
  5. Current limits of the inverter input
  6. Two roof faces, two MPPTs
  7. When string fuses are needed
IVRoof Mounting · pp. 25-30
  1. Working at height first
  2. Roof hooks on a tiled roof
  3. Slate, flat and in-roof systems
  4. Wind and structural loads
  5. Rails, clamps and spacing
  6. Keeping the roof watertight
VDC Wiring and Isolation · pp. 31-37
  1. DC solar cable
  2. DC connectors: same make, same type
  3. Never break DC under load
  4. The DC isolator
  5. Minimising loop area
  6. Protecting the DC route inside the house
  7. DC labelling
VIInverter, AC Side and Batteries · pp. 38-44
  1. String inverter, microinverters, optimisers
  2. Mounting the inverter
  3. The AC circuit to the consumer unit
  4. Which RCD type?
  5. Dual supply and isolation at the origin
  6. Adding a battery
  7. Where a battery can go
VIIEarthing and Surge Protection · pp. 45-49
  1. Earthing arrangement first
  2. Do the module frames need earthing?
  3. Surge protection on the DC and AC sides
  4. Lightning protection systems
  5. Earthing a battery or hybrid system
VIIITesting, Grid Connection and Handover · pp. 50-58
  1. Testing order at a glance
  2. Polarity and Voc check
  3. Short-circuit current safely
  4. Insulation resistance on the DC side
  5. Functional tests and commissioning
  6. G98 or G99?
  7. Export limitation
  8. The handover pack
  9. Explaining the system to the client
IXRevision and Checklists · pp. 59-64
  1. The whole job on one page
  2. String sizing in five lines
  3. Safe isolation on a PV system
  4. Labels checklist
  5. Most frequent slips on PV jobs
  6. What's asked most on the course

One Page, One Topic, All Clear

Think of it this way:

The string is planned, the inverter is on order, and you need the open-circuit voltage on the coldest morning of the year before you commit to the string length.

You open the cold-weather Voc page and see the module's voltage climbing as the thermometer drops, with a worked example right beside it.

BS EN 50618 PV cable, double insulated, sized on Isc max = 1.25 × Isc(STC)

The same with the DC isolator, G98 or G99, the RCD type, the earthing arrangement and the handover pack: each one on its own page, always in the order of the job.

Solar PV Installation Illustrated is 9 parts and 60 topics, all drawn, closing with revision checklists, string sizing in five lines and the whole job on one page.

What you see drawn, you don't have to memorize.

What's Inside Solar PV Installation Illustrated:

Ipp. 5-10

The System on One Drawing

The whole system on one diagram, DC side versus AC side, cell to array, reading a datasheet, the I-V curve and where the rules come from.

IIpp. 11-17

Site Survey and Design

The site survey in order, orientation and pitch, shading and the sun-path diagram, annual yield, sizing to the household, inverter size and the cable route.

IIIpp. 18-24

Strings and Sizing

Series and parallel, Voc in the cold, maximum and minimum string length with worked examples, the MPPT window, inverter current limits, two roof faces and string fuses.

IVpp. 25-30

Roof Mounting

Working at height first, roof hooks on tiles, slate, flat and in-roof systems, wind and structural loads, rails and clamps, and keeping the roof watertight.

Vpp. 31-37

DC Wiring and Isolation

DC solar cable, matching connectors, never breaking DC under load, the DC isolator, loop area, protecting the route indoors and DC labelling.

VIpp. 38-44

Inverter, AC Side and Batteries

String inverters, microinverters and optimisers, mounting the inverter, the AC circuit, which RCD type, dual supply and isolation, and adding a battery.

VIIpp. 45-49

Earthing and Surge Protection

The earthing arrangement first, module frames, surge protection on both sides, lightning protection systems and earthing a battery or hybrid system.

VIIIpp. 50-58

Testing, Grid Connection and Handover

The testing order, polarity and Voc, Isc safely, DC insulation resistance, commissioning, G98 or G99, export limitation, the handover pack and briefing the client.

IXpp. 59-64

Revision and Checklists

The whole job on one page, string sizing in five lines, safe isolation, the labels checklist, the most frequent slips and what's asked most on the course.

At the end of the book: Revision checklists, string sizing in five lines and the whole job on one page.

Plus: 2 Free Books

Solar PV Practice Questions: Exam-Style Q&A with Answers

BONUS 1: «Solar PV Practice Questions: Exam-Style Q&A with Answers»

Value on its own: US$ 17.90

Test yourself on strings, isolation, testing and grid connection with exam-style questions, each answer explained so you know why, not just what.

15 Common Solar PV Mistakes: Before and After

BONUS 2: «15 Common Solar PV Mistakes: Before and After»

Value on its own: US$ 14.90

See the slips that turn up most often on PV jobs, from unlabelled DC cables to badly sealed roof hooks, each one drawn wrong and then right.

Solar PV Installation Illustrated with 2 Free Books

  • Solar PV Installation Illustrated: 64 illustrated pagesUS$ 63
  • BONUS 1: Solar PV Practice Questions: Exam-Style Q&A with AnswersUS$ 17.90
  • BONUS 2: 15 Common Solar PV Mistakes: Before and AfterUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT SOLAR PV INSTALLATION ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Solar PV Installation Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're on the solar PV course

You're on the solar PV course

Every topic from the course has its own drawn page, so each evening's study lands on something you can see, not another block of notes.

Your exam is close

Your exam is close

String sizing, the DC test order and G98 or G99 in one place, always in the same order, ready to revise the week before.

You're already fitting PV

You're already fitting PV

Print the pages you need and keep them in the van: survey, isolation, labels and testing, one look before you go up the ladder.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT SOLAR PV INSTALLATION ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Solar PV Installation Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I'm an experienced electrician new to solar PV?

Yes. It doesn't explain what a volt is: it starts from the whole PV system and focuses on what's different, the DC side, strings, isolation, testing and grid connection.

Is it for the UK, and where does the content come from?

Yes, it's written for the UK. It follows the topics of the City & Guilds 2922-34 course and is checked against BS 7671 (Section 712), the IET Code of Practice for grid-connected PV, MIS 3002, ENA G98 and G99 and BS EN 62446-1.

Is it official material?

No. It's an independent illustrated study book, not affiliated with or endorsed by City & Guilds, MCS, the IET, the ENA or BSI.

Does it replace the course or my training?

No. It's for revising and organising what the course teaches. It doesn't give you a certificate or count towards MCS certification, and it doesn't replace your training, the practical assessment or the manufacturer's instructions.

Are the practice questions the exam questions?

No. They're written for this book, in exam style, with each answer explained. They're not official questions from any exam.

How do I get it?

The book and the 2 free books arrive as PDFs by email, at the address you enter at checkout.

Do I have to pay every month?

No. It's a one-off payment, with no subscription.

Can I have it on paper?

Yes. The PDF is ready to print, so you can print the whole book or just the pages you want in the van.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading with nothing sticking.

String sizing and the DC test order, drawn and clear.

You reach the exam and the roof knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT SOLAR PV INSTALLATION ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.